Audi A4, S4 + Introduction + Governing bodies and receptions of safe operation + Current leaving and service + Engine + Systems of cooling, heating and air conditioner + Power supply systems, release and decrease in toxicity of the fulfilled gases - Systems of electric equipment of the engine + ignition and engine management System + System of preheat of the diesel engine + Diagnostics of systems of electronic control and diagnostic equipment - Charging and start systems General information The storage battery - the main data and acquisition of the new battery Check and charging of the storage battery Replacement of the storage battery Storage of the storage battery Charging system - general information and security measures Check of system of a charging Removal and generator installation Removal and regulator installation tension/replacement of brushes System of start of the engine - the general information and precautionary measures Removal and starter installation Check of system of start of the engine + Manual box of gear shifting + Automatic transmission + Coupling, power shafts and differential + Brake system + Suspension bracket and steering + Body + Onboard electric equipment
|
Removal and regulator installation tension/replacement of brushes Removal
|
Remove the generator, address to appropriate section.
|
|
Depending on model removal of a regulator possibly also on the established generator. |
|
Unscrew nuts on connecting plugs.
Turn out screws and remove a protective cover from the generator.
|
|
Depending on model generators of various executions can be established. |
|
Turn out screws and take out a regulator aside.
Replace brushes, for what отпаяйте a rope.
Check wear of rings, if necessary pierce them and polish (work HUNDRED).
|
|
|
Installation
|
Insert new brushes (And) and springs (In) in a shchyotkoderzhatel (C) and solder contacts.
|
|
To exclude solder hit in a rope at the soldering, clamp a brush rope flat-nose pliers.
|
|
At solder hit ropes become rigid and brushes unsuitable for work. |
|
Establish into place a regulator of tension and fix it.
After installation of new brushes check them on ease of a course.
Fix on the generator a protective cover.
Screw nuts on connecting plugs.
Establish into place the generator, address to the Section Removal and generator installation.
|
|
|
|