Audi A4, S4

since 2000 of release

Repair and car operation



Audi A4, S4
+ Introduction
+ Governing bodies and receptions of safe operation
+ Current leaving and service
- Engine
   Specifications
   Removal and installation of the top cover of the engine / bottom protection of an impellent compartment/stretcher
   Compression check in engine cylinders, identification of leaks
   Engine check by means of the vacuum gage
   - 4-cylinder petrol engines
      General information
      Removal and installation of a gear belt
      Removal and installation of a head of cylinders
      Removal and installation of a belt of a drive of auxiliary units
   + 6-and 8-cylinder petrol engines
   + 4-cylinder diesel engines
   + 6-cylinder diesel engines
   + System of greasing of the engine
+ Systems of cooling, heating and air conditioner
+ Power supply systems, release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling, power shafts and differential
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


f6be02a9

Removal and installation of a head of cylinders

Petrol engine of 1.6 l of ALZ

Head of cylinders. Petrol engine of 1.6 l of ALZ

1 — the Cover
2 — Consolidation. At damage replace
3 — the Oil separator
4 — the Holder
5 — the Screw, 10Нм
6 — Consolidation. Surely replace
7 — the Screw, 10Нм
8 — the Connecting branch pipe
9 — the Eye
10 — the Screw, 20Нм
11 — Sealing laying of a head of cylinders. Surely replace After replacement of laying it is necessary to replace cooling liquid.
12 — the Head of cylinders
Check existence of deformations. Admissible not planeness: 0.1 mm. After replacement of a head of cylinders it is necessary to replace cooling liquid. The minimum height after processing: 132.6 mm.

13 — the Bolt of fastening of a head of cylinders. Surely replace. Bolts of Polydrive are turned out and rolled by the AUDI-3452 or HAZET 2779-9 tool. Observe sequence of an otvorachivaniye and an inhaling of bolts.
14 — Sealing laying. At damage replace.
15 — the Cover of a head of cylinders
16 — the Bolt with the remote plug, 10Нм
Sequence of an inhaling from within outside cross-wise
17 — the Screw, 10Нм
18 — Ventilating connection to a broad tank
19 — the Sealing ring. Surely replace
The specified process demands existence of a certain experience. Therefore the description only the most important instructions intended for the skilled mechanic here is provided.

General instructions

Surely replace bolts of fastening of a head of the cylinders, being self-stopped nuts, the bolts tightened by a dinamometrichesky key, and also sealing rings and laying.

If the replaceable head of cylinders is established, before installation of a cover of a head of cylinders it is necessary to grease all contact surfaces between basic elements, roller levers and sliding surfaces of cams of a camshaft.

For protection of open valves it is authorized to delete plastic laying only before installation of a head of cylinders.

If the head of cylinders is replaced, it is necessary to replace cooling liquid.

Instructions on removal

 PERFORMANCE ORDER

    The head of cylinders acts in film only on the cold engine (not higher than body temperature). Remove maple a belt and the tension device. Remove a gear belt, address to the Section Removal and installation of a gear belt. The fuel system is under pressure! Before a detachment of hoses close connection by a thick rag. Then, carefully turning on a hose, remove pressure. After opening топливопроводов close openings to exclude hit in fuel system of dirt. Remove the inlet pipeline. At removal of a reception pipe of system of production of the fulfilled gases watch that the stykovochny element in an exhaust pipe was not bent more than on 10 °. Unscrew bolts of fastening of a cover a head of cylinders cross-wise.
    Unscrew bolts of fastening of a head of cylinders in sequence with 1 on 10 at first on a half of turn, and then in the same sequence completely.

Instructions on installation

 PERFORMANCE ORDER

    In the presence of cracks between saddles of valves or between a saddle and a carving opening under a candle the head of cylinders can be used further if the width of cracks does not exceed 0.3 mm or only the first 4 rounds of a carving are mentioned. In deaf openings under bolts of fastening of a head of cylinders in the block of cylinders availability of oil or cooling liquid is not allowed. Remove oil or liquid with a rag and a screw-driver. New laying of a head of cylinders take out from packing only directly ahead of installation. Address with sealing laying extremely carefully. Damages of laying lead to tightness loss. Carefully clear sealing surfaces of a head and the block of cylinders. Thus watch that on surfaces there were no flutes or scratches of big length (at emery paper application its granularity should not exceed 100 units). Carefully remove the emery paper remains. If the cranked shaft in the course of work was turned - establish the piston of the first cylinder in situation VMT and again turn a cranked shaft back a little, address to the Section Removal and installation of a gear belt. Before installation to the place of a head of cylinders establish cranked and distributive shaft in position VMT of the first cylinder, address to the Section Removal and installation of a gear belt. For centering insert into a forward external opening for bolts of fastening of a head of cylinders directing opravka of AUDI-3450/2А or HAZET 2571-5.

Before installation of a head of cylinders check, it is possible to take out up directing opravka. If necessary, it is a little прошлифуйте a notch of a directing opravka.

    Establish new sealing laying so that the inscription on it (spare part number) could be read. Establish a head of cylinders, insert the remained 8 bolts of fastening and tighten them by hand. Turn out through openings for a bolt directing opravka, rotating it to the left. Insert the remained 2 bolts of fastening of a head of cylinders and also tighten them by hand.
    Tighten bolts of fastening of a head of cylinders in sequence with 1 on 10 efforts given in Specifications.
    Further installation is carried out in sequence, return to removal. Establish into place a gear belt and adjust gazoraspredeleniye phases. Establish maple a belt and the tension device. Replace cooling liquid.

Petrol engines 1.8 and 2.0 of l

Head of cylinders. Petrol engine of 1.8 l

1 — Sealing laying of a head of cylinders. At installation number of the spare part should show towards a head of cylinders. After replacement of laying it is necessary to replace cooling liquid
2 — the Head of cylinders. After replacement it is necessary to replace cooling liquid. Minimum height: 139.20 mm.
3 — the Oil separator
4 — the Bolt of fastening of a head of cylinders
5 — the Cover of a head of cylinders
6 — the ignition Coil
7 — the Cover
8 — Consolidation. In the presence of damage or a leakage replace

9 — the Nut, 10Нм. At first external nuts, an inhaling cross-wise are tightened internal, then
10 — Consolidations of a cover of a head of cylinders. In the presence of damage or a leakage are replaced. Before installation transitions are condensed with AMV 174 004 01 AUDI hermetic.
11 — Consolidation. Surely replace
12 — the Combined valve of supply of secondary air, with a branch pipe
13 — the Bolt, 10Нм
14 — the Flange with the sensor of temperature of cooling liquid
15 — the Bolt, 10Нм
16 — the Sealing ring. Surely replace

Hinged elements of a head of the block of cylinders. Petrol engine of 1.8 l

1 — Sealing laying. Observe the correct adjusting situation. Surely replace
2 — the Nut, 10Нм
3 — the Bolt, 10Нм
4 — the Sealing ring of an injector. Surely replace
5 — the Fuel distributive highway with injectors
6 — the Top pipe of cooling liquid
7 — the Bolt, 10Нм

8 — the Bolt, 10Нм
9 — the Sealing ring of the top pipe of cooling liquid
10 — the Bolt, 10Нм
11 — the Inlet pipeline
12 — the Bolt, 20Нм
13 — the Support of the inlet pipeline

The general instructions are similar to the petrol ALZ engine of 1.6 l. On illustrations the petrol AVJ/BFB engine is represented. The design of the petrol engine of 2.0 l is similar.

Consolidation of places of interface of a cover double bearings/heads of cylinders

 PERFORMANCE ORDER

    Engine of 1.8 l: Grease places specified by shooters on the top sealing surface of a head of cylinders with a small amount of hermetic, for example, AMV 174 004 01.

Consolidation of places of interface of the mechanism of adjustment of camshafts and head of cylinders

 PERFORMANCE ORDER

    Engine of 1.8 l: Grease the places specified by shooters on the top sealing surface of a head of cylinders with a small amount of hermetic, for example, AMV 174 004 01.

Detachment of a cover of a head of cylinders

 PERFORMANCE ORDER

    Turn out nuts (arrows on an accompanying illustration) fastenings of a cover of a head of cylinders and uncover.

Tightening of bolts of fastening of a head of cylinders

 PERFORMANCE ORDER

    At an inhaling of bolts of fastening of a head of cylinders sequence - return to a detachment, i.e. with 10 on 1.
    Tighten bolts of fastening of a head of cylinders in sequence with 1 on 10 efforts specified in Specifications.