Audi A4, S4

since 2000 of release

Repair and car operation



Audi A4, S4
+ Introduction
+ Governing bodies and receptions of safe operation
+ Current leaving and service
- Engine
   Specifications
   Removal and installation of the top cover of the engine / bottom protection of an impellent compartment/stretcher
   Compression check in engine cylinders, identification of leaks
   Engine check by means of the vacuum gage
   + 4-cylinder petrol engines
   + 6-and 8-cylinder petrol engines
   + 4-cylinder diesel engines
   - 6-cylinder diesel engines
      General information
      Removal and installation of a gear belt of a drive of GRM
      Removal and installation of a head of the block of cylinders
      Removal and installation of a belt of a drive of auxiliary units
   + System of greasing of the engine
+ Systems of cooling, heating and air conditioner
+ Power supply systems, release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling, power shafts and differential
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


f6be02a9

Removal and installation of a head of the block of cylinders

Head of the block of cylinders (it is shown left). Diesel engine of 2.5 l

1 — the Left head of cylinders. Attention: Heads of cylinders of the diesel engine are not allowed to be processed
2 — Sealing laying of a cover of a head of cylinders. In the presence of damages or a leakage replace. Before installation of transition are greased with hermetic
3 — the Bolt of fastening of a head цилиндров*
4 — the Cover a head of cylinders. In the presence of damages of laying at nozzles replace a cover a head of cylinders
5 — Otboynoye a ring. In the presence of damages replace
6 — Consolidation. In the presence of damages replace
7 — the Cover
8 — Fuel pipelines, 30Нм. Replace in a set. Do not deform
9 — the Returnable pipeline
10 — Sealing кольцо*
11 — the Hollow bolt, 5Нм

12 — the Inlet pipeline
13 — the Bolt, 10Нм. Are tightened cross-wise for some receptions
14 — Sealing прокладка*
15 — the Adjusting plug, 2 pieces. Watch that the plug did not fall to inlet canals
16 — Nuts, 10Нм. Are tightened cross-wise for some receptions
17 — the Heat-shielding leaf
18 — the Bolt, 10Нм
19 — the Vacuum pump of the amplifier of a brake
20 — the Sealing ring of the vacuum pump
21 — Sealing laying of a head of cylinders. Has various thickness. Number of a detail should show towards a head of cylinders
*) surely replace.

The sequence of a tightening of bolts of fastening of a head of cylinders is given on an illustration below.

Order of a tightening of bolts of fastening of a head of cylinders
Otvorachivaniye is made in return sequence with 8 on 1.
Efforts are given in Specifications.